DESCRIPTIONSKKMigas controls the management of KKKS activities through the WP&B approval mechanism, AFE (Pre Audit), Monitoring and controlling activities (Current Audit) and inspection of activity results (Post Audit). In building production facilities, KKKS with operational responsibilities must carry out conceptual studies, engineering, design and construction of production facilities with structured and directed management stages in accordance with good engineering principles. Purpose and objectives:
|
||
| OUTLINE COURSE |
OVERVIEW
PROJECT STAGE
PENGAWASAN DAN PENGENDALIAN
KETENTUAN PELAKSANAAN TAHAPAN PROYEK
PIS PRODUCTION FACILITIES
CLOSE OUT AFE
|
|
| RECOMMENDED AUDIENCE |
|
|
Instructor: Ir. Iswahyudi
Tempat dan Jadwal : Jakarta-Bandung-Surabaya-Jogja-Bali
| JAN. | FEB. | MAR. | APR. | MEI | JUNI | JULI | AGT. | SEP. | OKT | NOV. | DES. | Harga |
| 21-23 | 18-20 | 23-25 | 13-15 | 20-22 | 4-6 | 30-1 | 20-22 | 3-5 | 29-31 | 26-28 | 1-3 | 7.500.000 |
Note:
– Minimal Running 3 Peserta
– Apabila Perusahaan mengirimkan minimal 3 Peserta, Bisa Request Tempat & Tanggal
FASILITAS UNTUK PESERTA :
- Modul Training
- Sertifikat
- ATK: Block Note dan Ballpoint
- Ruang Training dengan fasilitas Full AC dan multimedia
- Makan siang dan 2 kali coffee break selama training
- Qualified Instructor
Views: 0
