TRAINING POD, WP&B, AFE CONCEPT BASED IN UPSTREAM OIL & GAS

DESCRIPTION

Plan of Development is the key point in Oil & Gas Business of Indonesia Upstream Oil and Gas Industry. POD is a guideline for KKKS to operate their project. There is a planning program that describe of project activity during the contract. KKKS should construct the detail of program activities and budgeting (WP&B) and Financial Authorization (AFE). POD, WP&B and AFE is the integrated aspect that every KKKS should propose to SKKMIGAS. Therefore, between SKKMIGAS and KKKS should have the same perception all about aspect of POD, WP&B and AFE especially about the basic principle, mechanism & procedure, system and operational guidance.

OUTLINE COURSE

MODULE 1: INTRODUCTION TO THE UPSTREAM OIL AND GAS INDUSTRY & REGULATIONS
  • An Introduction to the Industry: Understanding the dynamics of the oil and gas business and the critical role of planning and budgeting.
  • Institutional Framework: The roles of the Government, SKK Migas, and Production Sharing Contract (PSC) Contractors.
  • Production Sharing Contract (PSC): A refresher on the PSC concept, cost mechanisms (cost recovery or gross split), and tax aspects.
  • System Integration: The workflow relationship between the POD, WP&B, and AFE documents.
MODULE 2 : PLAN OF DEVELOPMENT (POD)
  • Definition & Objectives: To understand the POD as the basic guideline for KKKS in operating field development projects.
  • Key Components: Technical aspects (geology, geophysics, reservoir, production, facilities) and commercial aspects (project economics).
  • Preparation Procedures: The process for submitting proposals for the first commercial field development (POD I) as well as subsequent fields (POD II, etc.).
  • Case Study: Evaluation of investment profitability indicators and field risk analysis
MODULE 3: WORK PROGRAM & BUDGET (WP&B)
  • Definition & Function: Preparation of the KKKS’s annual work plan and comprehensive budget allocation.
  • Document Structure: Categorization of exploration, development, production, and general administrative costs.
  • WP&B Control & Preparation: BS 1 – BS 17
  • Evaluation Process: Mechanisms for discussion, negotiation, revision, and mutual approval with SKK Migas.
  • Monitoring & FQR: Introduction of periodic financial performance reporting through the Financial Quarterly Report (FQR).
MODULE 4: AUTHORIZATION FOR EXPENDITURE (AFE)
  • Basic Concept: The AFE serves as a financial authorization instrument to fund each specific activity approved in the Work Plan and Budget (WP&B).
  • Control Budget & Expenditure: BS 18 – BS 24
  • AFE Life Cycle: The submission process, approval by management and regulators, monitoring of actual expenditures, and the close-out process (AFE Close Out).

RECOMMENDED AUDIENCE

  • Planning, Budgeting & Cost Control Engineers/Analysts
  • Petroleum Economists & Commercial Managers
  • Field Development & Asset Managers
  • Project Managers & Lead Engineers (Facilities, Drilling, Production)
  • Joint Venture (JV) & Contract Specialists Regulatory Compliance & Government Liaison Officers

 

Instructor: Consultant Team PT IFORBIT

Tempat dan Jadwal : Jakarta-Bandung-Surabaya-Jogja-Bali

JAN. FEB. MAR. APR. MEI JUNI JULI AGT. SEP. OKT NOV. DES. Harga
21-23 18-20 23-25 13-15 20-22 4-6 30-1 20-22 3-5 29-31 26-28 1-3 8.500.000

Note: 

– Minimal Running 3 Peserta

–  Apabila Perusahaan mengirimkan minimal 3 Peserta, Bisa Request Tempat & Tanggal

FASILITAS UNTUK PESERTA :

  1. Modul Training
  2.  Sertifikat
  3.  ATK: Block Note dan Ballpoint
  4.  Ruang Training dengan fasilitas Full AC dan multimedia
  5. Makan siang dan 2 kali coffee break selama training
  6.  Qualified Instructor

Views: 2