|
OVERVIEW Investments in an oil and gas project involve large amounts of funds so that studies are needed to anticipate various possibilities that will occur from the project. The existence of high uncertainty in oil and gas projects, both from a technical and non-technical perspective, causes the risk of oil and gas projects to be relatively higher compared to projects from other industries. Project assessment is carried out to estimate the possible level of profitability of an investment project. The results of a project assessment include:
|
||
| COURSE OUTLINE |
|
|
| RECOMMENDED AUDIENCE |
|
|
Instructor: Consultant Team PT IFORBIT
Tempat dan Jadwal : Jakarta-Bandung-Surabaya-Jogja-Bali
| JAN. | FEB. | MAR. | APR. | MEI | JUNI | JULI | AGT. | SEP. | OKT | NOV. | DES. | Harga |
| 21-23 | 18-20 | 23-25 | 13-15 | 20-22 | 4-6 | 30-1 | 20-22 | 3-5 | 29-31 | 26-28 | 1-3 | 8.500.000 |
Note:
– Minimal Running 3 Peserta
– Apabila Perusahaan mengirimkan minimal 3 Peserta, Bisa Request Tempat & Tanggal
FASILITAS UNTUK PESERTA :
- Modul Training
- Sertifikat
- ATK: Block Note dan Ballpoint
- Ruang Training dengan fasilitas Full AC dan multimedia
- Makan siang dan 2 kali coffee break selama training
- Qualified Instructor
Views: 0
