OBJECTIVES :
his course is designed to provide a comprehensive introduction to all aspects of utility and inspection pigging. The aim of the training program is to help individuals, from a variety of backgrounds, to become familiar with and understand pipeline pigging and its applications.
PRE-REQUISITE :
Not specified : Operator/Senior Operator/Engineer/Non Engineer, Pipeline Engineers, Pipeline Construction, Project Managers, Maintenance Engineers, Contractors, Supervisors, Inspectors, Operators, Equipment Suppliers, Inspection and Quality Engineers, Pipeline Design Engineers
TRAINING MEHOD :
Presentation, Discussion, Case Study, Evaluation
COURSE OUTLINE :
Why Pig Pipelines
- Introduction
- Pigging During Construction
- Pigging During Operation
- Specialist Applications
On-Line Inspection Techniques : Available Technology
- Introduction
- Available ILI Tools
- Current ILI Technology
- Why Technology is Best
Pipeline Design For Pigging
- Introduction
- Conceptual Design
- Desain Details
- Pipeline Components
Pre-Inspection-Survey Activities For Magnetic-Flux Intelligent Pigs
- Introduction
- Pre-Contract Activities
- Pipe-Wall Surface Condition
- Pipeline Pgging
Pigging And Inspection Of Flexible Pipes
- Introduction
- Undestanding Pipe Construction
- Composite Construction and Complex Behaveour
- Stresses on casing
- Defects and Modes of Failures
10 Years Of Intelligent Pigging: An Operator’s View
- Introduction
- Pipeline Datails
- Gas Quality and Quantity
- Geometric Inspection
- Intelligent Pigging
- Comparison Between Magnetics and Ultrasonics
The History and Application Of Foam Pigs
- What is a Poly Pigs ?
- History
- Specification Design
- Common Types of Poly Pig
Pigging and Chemical Treatment Of Pipelines
- Introduction
- Paraffin Treatment
- Corrosion Control in Pipelines
- Biocides treatment of Pipelines
- Selection of Pig Design
Specialist Pigging Techniques
- Introduction
- Specialist Pigs
- Multi-diameter Pig
- Pressure By-Pass Pig
- Magnetic Cleaning Pig
- Pin-Wheel Pig
- Brush Pig
- Shunting Pig
- Easy Loading Pig
The Assessment Of Pipeline Defects Detected During Pigging Operations
- Introduction
- On-Line Inspection Data
- Calculating The Failure Pressure of Corrosion in Pipeline
- Safety Factors on Failure Pressures
- A Methodology
- Concluding Remarks
Instructor : Consultant Team PT. IFORBIT
Tempat dan Jadwal : Jakarta-Bandung-Yogya-Bali
JAN. | FEB. | MAR. | APR. | MEI | JUNI | JULI | AGT. | SEP. | OKT. | NOV. | DES. | HARGA |
27-29 | 5-7 | 10-12 | 16-18 | 7-9 | 25-27 | 23-25 | 11-13 | 17-19 | 13-15 | 5-7 | 1-3 | 8.500.000 |
TERMS AND CONDITION :
Harga : Belum Termasuk Pajak 11 %
FACILITY FOR PARTICIPANT Offline :
- Modul Training
- Sertifikat Pelatihan
- ATK : Block Note dan Ballpoint
- Souvenir Training
- Ruang Training dengan Fasilitas Full AC dan Multimedia
- Makan Siang dan 2 kali Coffee Break Selama Training
- Qualified Instructor Training
Lihat jadwal selengkapnya tentang engineering MIGAS di sini…
Views: 2