DESCRIPTIONPlan of Development is the key point in Oil & Gas Business of Indonesia Upstream Oil and Gas Industry. POD is a guideline for KKKS to operate their project. There is a planning program that describe of project activity during the contract. KKKS should construct the detail of program activities and budgeting (WP&B) and Financial Authorization (AFE). POD, WP&B and AFE is the integrated aspect that every KKKS should propose to SKKMIGAS. Therefore, between SKKMIGAS and KKKS should have the same perception all about aspect of POD, WP&B and AFE especially about the basic principle, mechanism & procedure, system and operational guidance. |
||
OUTLINE COURSE |
MODULE 1: INTRODUCTION TO THE UPSTREAM OIL AND GAS INDUSTRY & REGULATIONS
MODULE 2 : PLAN OF DEVELOPMENT (POD)
MODULE 3: WORK PROGRAM & BUDGET (WP&B)
MODULE 4: AUTHORIZATION FOR EXPENDITURE (AFE)
|
|
RECOMMENDED AUDIENCE |
|
|
Instructor: Consultant Team PT IFORBIT
Tempat dan Jadwal : Jakarta-Bandung-Surabaya-Jogja-Bali
| JAN. | FEB. | MAR. | APR. | MEI | JUNI | JULI | AGT. | SEP. | OKT | NOV. | DES. | Harga |
| 21-23 | 18-20 | 23-25 | 13-15 | 20-22 | 4-6 | 30-1 | 20-22 | 3-5 | 29-31 | 26-28 | 1-3 | 8.500.000 |
Note:
– Minimal Running 3 Peserta
– Apabila Perusahaan mengirimkan minimal 3 Peserta, Bisa Request Tempat & Tanggal
FASILITAS UNTUK PESERTA :
- Modul Training
- Sertifikat
- ATK: Block Note dan Ballpoint
- Ruang Training dengan fasilitas Full AC dan multimedia
- Makan siang dan 2 kali coffee break selama training
- Qualified Instructor
Views: 2
