TRAINING WORK BREAKDOWN STRUCTURE (WBS) FOR TANGIBLE DRILLING COST

DESCRIPTION

This course offers a solution to create a reliable database of drilling activity by standardizing the Work Breakdown Structure (WBS) through Budget Schedule (BS) 19 and BS 20 that are submitted to Indonesian Government Agency by the Production Sharing Contract (PSC) Contractors.

By standardizing WBS, it can give some advantages to Indonesian Government Agency i.e. provide reports on the use of materials and costs consistently and in a standard format, provide the material needs and the cost of a project, and develop a database for consolidate data to determine where the variances that exist between functional areas, project areas and projects during a specific time period. The database will provide an insight to how an improvement will be made to the need of material and the cost of drilling and workover project in the future.

Standardization of WBS models designed should also be multi-dimensional, because the ability of three-dimensional model allows stakeholders to view the data from three different perspectives.

OUTLINE COURSE
Overview
  • Creating a Work Breakdown Structure That Will Rein-in Costs
  • The advantages of using 3D WBS
3D Work Breakdown Structure (3D WBS)
  • The ZBS (Zone Breakdown Structure).
  • The PBS (Product Breakdown Structure).
  • The ABS (Activity Breakdown Structure)
Build the WBS
  • Choosing a method
  • Build the initial WBS
  • Building down the WBS
Standardizing WBS in BS 20
  • Description of materials to be used
  • Unit materials to be issued
Applying 3D WBS on Drilling and Workover Project
  • Option 1
  • Option 2
  • Option 2
RECOMMENDED AUDIENCE
  • Drilling & Well Construction Engineers
  • Cost Engineers & Cost Control Specialists
  • Rig Procurement & Supply Chain Managers
  •  Controls & Planning Engineers
  • Well Site Leaders & Drilling Supervisors (Company Men)
  •  Joint Venture (JV) & Cost Accounting Specialists

Instructor: Consultant Team PT IFORBIT

Tempat dan Jadwal : Jakarta-Bandung-Surabaya-Jogja-Bali

JAN. FEB. MAR. APR. MEI JUNI JULI AGT. SEP. OKT NOV. DES. Harga
21-23 18-20 23-25 13-15 20-22 4-6 30-1 20-22 3-5 29-31 26-28 1-3 8.000.000

Note: 

– Minimal Running 3 Peserta

–  Apabila Perusahaan mengirimkan minimal 3 Peserta, Bisa Request Tempat & Tanggal

FASILITAS UNTUK PESERTA :

  1. Modul Training
  2.  Sertifikat
  3.  ATK: Block Note dan Ballpoint
  4.  Ruang Training dengan fasilitas Full AC dan multimedia
  5. Makan siang dan 2 kali coffee break selama training
  6.  Qualified Instructor

Views: 2